Object 48/1 - 50/21
Container
Contains 46 Results:
3. Report on Waterfall Project C2 (8.45). Forced straight paths to calculate the speed distribution in the firing plane., 1943-11-06
File — Object: 48/1 - 50/21, Folder: Arch 50/16
Dates:
1943-11-06
4. Report on Waterfall Project C2 (8.45). Influence of different initial speeds when launching the catapult on the hit range T III of the aggregate C2-8/45, 1944-02-01
File — Object: 48/1 - 50/21, Folder: Arch 50/17
Dates:
1944-02-01
4. Waterfall report. Plane Tracing Curves. Target speed 150 m/s, 1944-05-23
File — Object: 48/1 - 50/21, Folder: Arch 50/18
Dates:
1944-05-23
6. Report on Waterfall Project C2 (8.45). Table of numbers for determining the aerodynamic force coefficients ca and cw in relation to the caliber area for the waterfall project, 1945-01-09
File — Object: 48/1 - 50/21, Folder: Arch 50/19
Dates:
1945-01-09
7. Report on Waterfall Project C2 (8.45). Numerical tables for determining various values required for orbital calculation for the waterfall project, 1945-01-09
File — Object: 48/1 - 50/21, Folder: Arch 50/20
Dates:
1945-01-09
12. Glider report. Number tables for determining the pressure point position H/D as well as the time course of the center of gravity position s/D and the moment of inertia 0 for the glider A4 V12/c (A4b), 1945-01-09
File — Object: 48/1 - 50/21, Folder: Arch 50/21
Dates:
1945-01-09