Object 36/1 - 41/5
Container
Contains 40 Results:
Archive Report No. 39/16. Atomizer - Calibrations. Order No.: SS 011 - 5340/42, 190-08-14
File — Object: 36/1 - 41/5, Folder: Arch 39/16
Dates:
190-08-14
3. Test report. Order No.: SS 011 - 5340/42, 1944-05-01
File — Object: 36/1 - 41/5, Folder: Arch 39/17
Dates:
1944-05-01
Atomizer - development. 1. Test report. Order No.: SS 011 - 5340/42, 1944-09-12
File — Object: 36/1 - 41/5, Folder: Arch 39/18 (Copy)
Dates:
1944-09-12
On June 13th, 1940, the pump was put into operation for the first time for a period of approx. 1 hour. Measuring devices were provided
File — Object: 36/1 - 41/5, Folder: Arch 40/3
Dates:
1920 - 1970
Third attempt on the Br.3/18 turbopump on November 4th, 1940. draw Oddesse No.E 27 - A, 1940-10-16
File — Object: 36/1 - 41/5, Folder: Arch 40/4
Dates:
1940-10-16
Stable course control through a loose in the return, 1940-03-05
File — Object: 36/1 - 41/5, Folder: Arch 41/1
Dates:
1940-03-05
DKR Pneumatic Peblers from Rightebetselm with air drive, 1940-02-09
File — Object: 36/1 - 41/5, Folder: Arch 41/2
Dates:
1940-02-09
The model laws of automatic control. 3rd copy, 1939-11-21
File — Object: 36/1 - 41/5, Folder: Arch 41/3
Dates:
1939-11-21
The kinematic error of gimballed heading gyros. 1st copy, 1939-12-01
File — Object: 36/1 - 41/5, Folder: Arch 41/4
Dates:
1939-12-01
Automatic control of air torpedoes and aircraft, taking into account pushing, 1940-05-27
File — Object: 36/1 - 41/5, Folder: Arch 41/5
Dates:
1940-05-27