Object 14/25 - 14/89
Container
Contains 63 Results:
Flight mechanics report. (Linear approximation formula for the lateral deviation due to earth calculation), 1942-10-21
File — Object: 14/25 - 14/89, Folder: Arch 14/46
Dates:
1942-10-21
Flight mechanics report. (Replacement of the variable measuring angles a and E by two fixed central angles a 'and E'), 1942-10-29
File — Object: 14/25 - 14/89, Folder: Arch 14/47
Dates:
1942-10-29
Flight mechanics report. (Preliminary information on the permissible shear spread), 1942-10-29
File — Object: 14/25 - 14/89, Folder: Arch 14/48 (Copy)
Dates:
1942-10-29
Flight mechanics report. (Drive belt with different degrees of deflection according to V3), 1942-11-28
File — Object: 14/25 - 14/89, Folder: Arch 14/49
Dates:
1942-11-28
Flight mechanics report. (Number boards nine drive tracks of different deflection according to V3), 1942-11-30
File — Object: 14/25 - 14/89, Folder: Arch 14/50
Dates:
1942-11-30
Flight mechanics report. (Plunging oscillations: providing Zech's outline method), 1942-11-30
File — Object: 14/25 - 14/89, Folder: Arch 14/51
Dates:
1942-11-30
Flight mechanics report. (Plunging vibrations: Determination of dg max according to Zech's contour line method under simplified assumptions), 1942-12-01
File — Object: 14/25 - 14/89, Folder: Arch 14/52
Dates:
1942-12-01
Flight mechanics report. (Influence of altitude deviations of the locations in the Volman radio shutdown procedure), 1943-01-05
File — Object: 14/25 - 14/89, Folder: Arch 14/53
Dates:
1943-01-05
Flight mechanics report. (Plunging oscillations at variable 2ca/2x and new H/D curves), 1943-02-05
File — Object: 14/25 - 14/89, Folder: Arch 14/54 (Copy)
Dates:
1943-02-05
Flight mechanics report. (On the question of the end angle of the drive train), 1943-03-17
File — Object: 14/25 - 14/89, Folder: Arch 14/55
Dates:
1943-03-17