Box 16
Container
Contains 66 Results:
Adjustment of the ready-to-run unit in relation to the target firing level, 1941-10-04
File — Box: 16, Folder: 115/07
Dates:
1941-10-04
Wessungen at the magnetic Vestarker according to Prof. Buchhold, 1941-12-12
File — Box: 16, Folder: 115/08
Dates:
1941-12-12
For overlaying the far fields of omnidirectional radiators or dipoles, 1942-01-05
File — Box: 16, Folder: 115/09
Dates:
1942-01-05
Test report on the L.G.W. developed vertical, 1941-11-06
File — Box: 16, Folder: 115/10
Dates:
1941-11-06
The staying power of the newly developed Anschautz vertical compared to the Siemens vertical, 1942-02-25
File — Box: 16, Folder: 115/11
Dates:
1942-02-25
Siemens course gyroscope as guide for the control of the unit, 1942-04-09
File — Box: 16, Folder: 115/14
Dates:
1942-04-09
Calibration of the mechanical beacon model, 1942-06-19
File — Box: 16, Folder: 115/17
Dates:
1942-06-19
The 80 cm cal. R (rocket)-projectile with a useful load of one ton and a range of over 160 km, 1943-01-25
File — Box: 16, Folder: 115/20
Dates:
1943-01-25
Addendum to Report No.20 (The 80 cm R projectile with a tonne payload and a range of over 160 km)., 1943-01-29
File — Box: 16, Folder: 115/21
Dates:
1943-01-29