Box 8
Container
Contains 48 Results:
production proposal one - stoff - Ruberanlsge Lür Project "Waterfall", 1944-03-23
File — Box: 8, Folder: 56/18
Dates:
1944-03-23
Archive - Report No. 56/18 a. g.Kdos. Statement on Arch.Ber. 56/18 g.Kdos.
File — Box: 8, Folder: 56/18A
Dates:
1920 - 1970
Design of a printed circuit board for determining the pump operating values G p Na Nn (for operating speed No and conveying liquid with specific weight A or B from the test values Q' H' total and M'd measured with water (specific weight) at test speed n', 1944-07-20
File — Box: 8, Folder: 56/19
Dates:
1944-07-20
Summary of Necessary Experiments On The A-4 Injection-Set I Their Execution and Ecperiences So Far Won on Testing Block
File — Box: 8, Folder: 57/1
Dates:
1920 - 1970
Investigation of the pressure drop N2 high pressure during the combustion tests (V-units with series pump), 1943-05-14
File — Box: 8, Folder: 57/6
Dates:
1943-05-14
Simplified method of voting Report 1: 'Initial vote', 1943-12-28
File — Box: 8, Folder: 57/8
Dates:
1943-12-28
Development and experiments on the A4 combustion oil problem, 1943-07-23
File — Box: 8, Folder: 57/9
Dates:
1943-07-23
About the adiabatic exponets k for calculating thrust on the ground and during flightAbout the adiabatic exponets k for the calculation of the thrust at the bottom and heat, 1943-10-13
File — Box: 8, Folder: 57/11
Dates:
1943-10-13
About the combination of furnace pressure, throughput, thrust and mixing ratio for the 25 to and 8 to stages., 1944-01-10
File — Box: 8, Folder: 57/12
Dates:
1944-01-10
Simplified method of tuning Report 2: Tuning after spraying and firing tests, 1944-01-18
File — Box: 8, Folder: 57/13
Dates:
1944-01-18