Box 7
Container
Contains 80 Results:
McKinnon, P. "Response to Action Item No. 2 MDS Requirements and Modifications Recommendations", 1988-03-01
File — Box: 7, Folder: 24
Dates:
1988-03-01
AXAF team "A-109 Sensitive -- Comments on AXAF Phase B Final Study Reports", 1987-11-18
File — Box: 7, Folder: 25
Dates:
1987-11-18
"Reference Material for NGST", 1996-09-15 - 2002-02-20
File — Box: 7, Folder: 1
Dates:
1996-09-15 - 2002-02-20
Crout, R., Kenyon, D., & Palasciano, S. "Optical Telescope Assembly Project Report -- OTA Wavefront Error Budget Report", 1985-07
File — Box: 7, Folder: 2
"HST Status Briefing", 1990-07-02 - 1990-07-02
File — Box: 7, Folder: 2
Dates:
1990-07-02 - 1990-07-02
R. A. Rockwell "Test Plan -- Optical Telescope Assembly (OTA) Primary Mirror Strain-Free Tests", 1982-02-22
File — Box: 7, Folder: 3
Dates:
1982-02-22
W. Nardella "Optical Technology Division Design Assurance Engineering Memorandum -- Bonding of ULE Glass with 2216 Epoxy for OTA Mirror Mount - Final Report" , 1982-02-05
File — Box: 7, Folder: 3
Dates:
1982-02-05
W. Nardella "Optical Technology Division Design Assurance Engineering Memorandum -- Bonding of ULE Glass with 2216 Epoxy - Progress Report 1", 1981-12-15
File — Box: 7, Folder: 3
Dates:
1981-12-15
R. A. Rockwell "Primary Mirror Strain-Free Mount Force Field and Error Budget Analysis", 1981-03-12
File — Box: 7, Folder: 3
Dates:
1981-03-12
"P.E. Trip -- Review of Primary Mirror Strain-Free Mount Verification Plans at Perkin-Elmer on 24 April 1981", 1981-04-21
File — Box: 7, Folder: 3
Dates:
1981-04-21